To achieve goals of the Company
November,2012 –
Present Kenton Group
OSP Century Link Project
Design Engineer - Bellefontaine (OH)
§
Contractor Off-premise Project Design Engineer
Century Link Bellefontaine (West Ohio) Wire Centers
§
Progress updates on assigned and on-going projects
to immediate supervisor
§
Usage of Century Link programs namely EWO,
Mapviewer, Fireworks/Bidmaster, MARTENS (facilities information) and other
websites for additional data required for completion of design package.
§
Detailed Engineering Design for fiber to the cell
site and ethernet fiber service to customer.
§
Coordinates, prepares and submit all necessary
permit applications required for project..
May,2011 – October,
2012 ECSM Utility Contractor
OSP Century Link and
Horizontel Project Design Engineer - Wooster / Chilicothe (OH)
§
Contractor On-premise Century Link Lawrenceburg
District (Aurora) Wire Center
Engineer II IN – Direct responsibility of Outside Plant
Facilities
§
Progress updates on assigned and on-going projects
to immediate supervisor
§
Usage of Century Link programs namely EWO,
Mapviewer, Fireworks/Bidmaster, MARTENS (facilities information) and other
websites for additional data required for completion of design package.
§
Detailed Engineering Design for cut-over of CSA area
to new site, fiber to the cell site, ethernet fiber service to customer and
pole audits / pole make-ready for Project Sunesys
September,2008 – May,
2011 America Fujikura Limited (formerly Northstar
Communications Group)
OSP Senior AT & T Project
Design Engineer - Covington (LA)
§
Overall in charge of the Project Lightspeed / F2
Conditioning in SELA area.
§
Progress weekly meeting with AT&T, quality check
of F2 / As-built jobs and update of F2 job trackers
§
Direct supervision and monitor of eight design
engineers.
§
Usage of AT&T programs namely BSTCAD, Mapviewer,
OSPCM, LFACS (facilities informations) and websites for other data required
for completion of design package.
§
Detailed Engineering Design for Mesa 2 / VRAD cabinet
placements which includes coordination with related entities to complete
the project.
§
Study, evaluate and detailed design different BAU
type jobs within SELA – replacement and upgrade of SAI, distribution cable
facilities for new areas, relief and rehabilitation of existing cable
facilities et al.
March,2007 –
August,2008 America Fujikura Limited (formerly
Northstar Communications Group)
OSP Senior AT & T
Project Design Engineer - San Jose (CA)
§
Detailed F2 engineering conditioning (conventional
and MWP) design.
§
Preparation F2 verification job package prior to
field verification and conditioning design.
§
Design amendments on F2 condition jobs which are
called F2 go backs to complete final construction.
§
Design and revision of permit applications for VRAD
cabinet locations.
§
Usage of AT&T programs namely 2008 AutoCAD,
ARES, Fieldview, JAM (previously ACE), Execustar (facilities informations)
and websites for other data required for completion of design package.
April,2005 –
February,2007 Northstar Communications Group
OSP Senior Embarq Design
Engineer - Fort Walton Beach (FL), Jacksonsville (NC) and Las Vegas
(NV)
§
Detailed engineering designs for commercial and
residential areas.
§
Fiber Optic design to the curb for commercial and
residential areas.
§
Span line design for special circuits to provide
service to customer.
§
Design conversion from Fiber to copper facilities
for residential subdivision.
§
On-call. Issue sequential work order during
hurricane disaster that affects OSP facilities.
§
Usage of Embarq programs namely EWO, Mapviewer,
CLAS, PACS and ECP to complete engineering design package.
November,2004 – March,
2005 Northstar Communications Group
OSP Senior Fiber Design
Engineer – Verizon FTTP Project
§
Detailed feeder design for all primary routes of
Washington Central Office.
§
Area Network Planning to size the required fiber
optic primary and distribution cables.
§
Review, check and correct all distribution design
relative to the placement of Fiber Distribution Hub (FDH).
§
Detailed distribution design of fiber optic to the
premises for residential and commercial FDH area using existing OSP
structures and facilities.
July – October, 2004
Aerotek Automotive Inc.
Ford Quality Administrator
/ Laboratory Technician – Duratec V6 Program CEP 1
§
Drafts all the quality procedure and test documents
according to the Ford Engineering Specifications which are posted in the
“W” drive and hard copy at the binder.
§
Conducts, monitor and control the daily cleanliness
check for block, crank and heads based on production line Dynamic Control
Plan.
§
Performs various requested tests like the combustion
chamber volumetric, cross hatch hone et al as required on
production and validation.
§
Develop documentations and systems for quality
program reporting on production.
September, 2002 – June, 2004
Aerotek Automotive Inc
Ford Manufacturing
Engineer Washer Staff – Duratec V6 Program CEP 1
§
Conducts machine run-off on all washers for final
plant qualification acceptance which includes cycle time.
§
Monitor, evaluate and recommends alterations on the
process / components of the washers for production’s improvements.
§
Implementation of launch program to meet the timing
schedule, quality and production targets.
§
Develop documentation to support process
incorporation and program reporting requirements.
March – June, 2002 Northstar
Communications Group
SBC / PacBell Fresno
Drafter
§
Record job postings on completed work orders under
the Fresno District.
§
Preparation of CAD designs of primary (F1) and
secondary (F2) networks.
§
Conduct surveys to check and verify contentious
as-built plans.
|